Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13707771

- Product Categories
- Friendly Links
- home > Supply > Quanzhou spectrometer, Quanzhou spectrometer factory recommended [fine] sanitary ware designed for speed
Quanzhou spectrometer, Quanzhou spectrometer factory recommended [fine] sanitary ware designed for speed
Information Name: | Quanzhou spectrometer, Quanzhou spectrometer factory recommended [fine] sanitary ware designed for speed |
Published: | 2015-05-21 |
Validity: | 90 |
Specifications: | No |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | Quanzhou spectrometer, Quanzhou spectrometer factory recommended [fine] sanitary ware designed for speed Fujian fine speed Technology Co., Ltd. is a professional optoelectronic devices research and development, production and sales, as one of the equipment manufacturing services. Spectrometer Caution: Start 1.1 as downtime in 2-8 hours, the external cold water must first run 10 minutes, you must first run in the cold water for 5 minutes; such as downtime in more than eight hours, the need to run outside in cold water for 15 minutes, cold water It must first run for 10 minutes. 1.2 Opening the boot order of 1.3 to open the cold water cold water (COOLER) switch 1.4 open CTROL, VACUUM switch (to see if the vacuum drops to 10 or less, observe the cooling water conductivity is 10 or less) 1.5 open HEATER 1.6 open board high pressure Switch 1.7 turn on the computer, open MXF operating software, click Monitor, observe the status and check if everything is normal online 1.8, open the lower right panel X-RAY switch 1.9 Click on the upper left panel X-RAY ON button to open the X-ray - Follow (5KV-0mA) - (10KV-mA) - (15KV-0mA) - (20KV-0mA) - (20KV-5mA) - (20KV-10mA) increased order flow pipe, tube pressure. As down in 2-8 hours, then wait 10 minutes for each step; as downtime in more than eight hours, then wait 20 minutes per step 1.10 Click Maintenance field - after the pop-up Maintenance-MXF- Click Inrument Setup, Instrument Setup in the pop-up X-ray tube voltage below, pipe flow field, the two set (30, 20), click Go, you can make the light pipe condition resume standby operation can be carried out routine analysis. Under voltage shutdown normal circumstances, need to be shut down for debugging or other work, it can be shut down for routine work. 2.1 standby as the tube voltage 30KV, pipe flow 20mA. For shutdown, you can click on the Maintenance Field - pop Maintenance-MXF- click Instrument Setup, pop Instrument Setup- below the X-ray tube voltage, tube current field, the two respectively (20,10) - ( 20,0) - (10,0) - (0,0) to be reduced, and finally return 0. 2.2 When the tube voltage, tube current are the property under the condition of 0 can be shutdown. The panel X-RAY OFF 2.3 hit the switch closes below X-RAY HEATER 2.5 2.4 Close Close board high-voltage switchgear 2.6 Close CONSOLE, VACUUM switch off your computer and the MXF 2.7 operating software, turn off the computer if it is necessary to close 2.8 circulating water, then wait five minutes later, in the closed loop water, if not necessary, do not turn off - if necessary to close the outer loop water, wait 10 minutes after turning off the external circulating water, if not necessary, do not close. 2.9 turn the power switch box, the instrument completely powered off, it can perform maintenance check. |
Admin>>>
You are the 4757 visitor
Copyright © GuangDong ICP No. 10089450, Fujian fine speed Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 4757 visitor
Copyright © GuangDong ICP No. 10089450, Fujian fine speed Technology Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility